Updates

Stockholm Bypass Project

The new link will connect the southern and northern parts of the Stockholm county, relieve the arterial roads and the inner city of traffic and reduce the vulnerability of the Stockholm traffic system. To reduce the impact on sensitive natural and cultural environments, just over 18 km of the total 21 km of the link are in tunnels.

Project Details

Location: Stockholm (Sweden)
Ownership: Trafikverket
Owners Engineer: WSP, Sweco, AF, Grontmij, Aecom
Main Contractor: LKAB JV, Implenia, Zublin, NCC, Veidekke, Skanska, SubterraStart
Date: 2015
Cost: €3.1bn

Solution

  • Search - Use our network and expertise to profile and attract key personnel.
  • Project/RPO - Providing scale and scope in the delivery of projects at a reduced cost.
  • Conventional Recruitment - Ad-hoc recruitment for single placement payable on success.
  • Contract/Freelance - Provide teams of engineers for projects around the globe. A full mobilising service that assists with visas, mobilisation, taxes, insurances and payroll.

Outcome

Labour we have provided for Stockholm Bypass Project: 
  • Project Manager and Office Manager
  • Design Manager
  • Workshop Manager and Construction Manager
  • Contracts Manager
  • Electrician
  • Foreman x3
  • Quantity Surveyor and Surveying Team
  • KMA Manager
  • Planner
  • HSEQ Manager
  • Site Engineer
  • Superintendent
  • Data Coordinator and Document Controller
  • Concrete Supervisor

Client Testimonial

EWI has been a proficient recruiter in bringing us to the experts and engineers we have been in need of for our projects; EWI has been fast, reliable and professional in the quality of the profiles they present by guaranteeing a good match to what has been previously required.

At least 8 characters, 1 uppercase, 1 lowercase and 1 special character or number
Your file must be a doc, docx or pdf. No larger than 5MB